![]() ![]() ![]() The maximal lifespan of a NPP is determined by the length of the operating license issued by the Nuclear Regulatory Commission. ![]() In each period the operator decides whether to run the reactor at a given capacity level, to shut it down for preventive maintenance or refueling, or permanently close the plant for decommissioning. This paper presents a dynamic programming (DP) model of optimal operation of a nuclear power plant (NPP).
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |